Cabling Chronicles
Considerations for Using Hybrid Copper-Fiber Cable
In a previous blog, we covered what to do when you need to connect a device that is located beyond the 100-meter distance requirement and described four ways to address the problem—a new TR, the use of an extender device, extended-reach copper cable and fiber.
January 12, 2021
End of Year Reflections
When Winston Churchill said that the holiday season is not only one of rejoicing but also of reflection, he didn’t know that 2020 would be the year that family gatherings are kept to a minimum and parties take place over Zoom and FaceTime.
December 28, 2020
Is Power over Ethernet Safe?
Power over Ethernet (PoE) has been around now for several years, starting with Type 1 PoE (IEEE 802.3af) introduced in 2003 that delivers up to 15.4 W, with 13 W available for the device. That was followed by Type 2 PoE (sometimes referred to as PoE Plus) that delivers up to 30 W, with 25.5 W available for the device.
December 16, 2020
December 2, 2020
November 10, 2020
What’s the Difference Between Channel and Component Standards?
When it comes to cabling standards, you’ve probably heard of channel standards and component standards. The two are not one and the same, so we thought it might make sense to explain the difference, why you should care and how they are tested.
November 4, 2020
Extending and Testing Cable Runs Beyond 100 meters
In our last article on how to connect end devices beyond copper Ethernet’s 100 meter range, we looked at various solutions to the dilemma of needing to connect an end device that’s just a little too far from the nearest telecommunications room (TR), including building a new TR, the use of an extender device, fiber or extended-distance cabling.
October 8, 2020
Breaking the 100-Meter Barrier
It’s a common problem – you need to connect an end device that’s just a little too far from the nearest telecommunications room (TR). While industry standards limit the length of a channel to 100 meters, connecting the device maybe require a channel length of 150 meters or even 200.
There are four ways to address this problem. Let’s take a look at the options and their pros and cons.
September 23, 2020
Physical Infrastructure Management Reduces Network Downtime
Planet IRM and Fluke Networks have integrated LinkWare Live into the Planet Infrastructure Relationship Management software solution, allowing customers to access detailed cable test results from their physical asset network diagrams, providing a view we like to call “from network map to wiremap”. We asked the team at Planet to introduce their solution and the benefits of the integration – their article is below.
September 15, 2020
August 20, 2020